Click on one of the thumbnails to the right to view the corresponding item.
Search Results Click a thumbnail to view.
Tall ship Glenlee and the Riverside Transport Museum, Glasgow
18363
393
Doon the Watter - Glasgow to Bowling 2023
Tall ship Glenlee and the Riverside Transport Museum and the preparatory works for the Govan - Partick Bridge, taken by David Palmar. The cranes mark the site of the new swing bridge for pedestrians, wheelers and cyclists, which will extend from Water Row in Govan on the left (south) bank of the Clyde to Pointhoise Quay beside the Riverside Museum on the right (north) bank.
23 May 2023
Tall ship Glenlee, the Riverside Transport Museum and the River Kelvin, Glasgow
18362
393
Doon the Watter - Glasgow to Bowling 2023
Tall ship Glenlee, the Riverside Transport Museum, the River Kelvin and the preparatory works for the Govan - Partick Bridge over the Clyde, taken by David Palmar. The north side of the pedestrian, wheeler and cycle bridge will be on Pointhouse Quay at the Riverside Museum.
23 May 2023
Stockingfield Bridge under construction
17157
358
Glasgow - North (Ruchill, Hamiltonhill, Forth and Clyde Canal Glasgow Branch)
Stockingfield Bridge under construction over the Forth and Clyde and Glasgow branch canals in November 2021. It is a cable-stayed, twin-span suspension bridge which will connect pedestrians, cyclists and wheelers with the communities of Maryhill, Ruchill and Gilshochill, and enable continuous movement along the canals without leaving the towpath or encountering steps or danger from traffic. Taken by David Palmar
21 November 2021
Stockingfield Bridge under construction
17156
358
Glasgow - North (Ruchill, Hamiltonhill, Forth and Clyde Canal Glasgow Branch)
Stockingfield Bridge under construction over the Forth and Clyde and Glasgow branch canals in November 2021. It is a cable-stayed, twin-span suspension bridge which will connect pedestrians, cyclists and wheelers with the communities of Maryhill, Ruchill and Gilshochill, and enable continuous movement along the canals without leaving the towpath or encountering steps or danger from traffic. Taken by David Palmar
21 November 2021
Railway east of Kelvindale station, Glasgow, under construction
15943
27
Glasgow - Buildings and Scenery
Railway east of Kelvindale station, Glasgow, under construction in August 2004.
22 August 2004
Kelvindale station, Glasgow, under construction
15942
27
Glasgow - Buildings and Scenery
Railway line and Kelvindale station, Glasgow, under construction in August 2004. IN the background are the gas holders at Anniesland, which are no longer used.
22 August 2004
Railway line east of Kelvindale station, Glasgow
15941
27
Glasgow - Buildings and Scenery
Railway line at Kelvindale, Glasgow, under construction in 2005. The reopened line goes from Anniesland in the west to Queen St Upper via Maryhill.
03 April 2005
Kelvindale station under construction, 2005
15940
27
Glasgow - Buildings and Scenery
Railway station at Kelvindale, Glasgow, under construction in 2005. The reopened line goes from Anniesland in the west to Queen St Upper via Maryhill.
03 April 2005
M1 extension, Loughborough
15033
324
CEP - Leicestershire
M1 extension being built in August 1965, Knebworth near Loughborough, Leicestershire. Scanned from a slide taken by CE Palmar
20 August 1965
Airport terminal building, Foula
06128
170
Shetland - Foula
Airport terminal building, Foula. This building contains the island's only public toilet. Behind it is the airport fire station, and behind that on the lower slopes of Hamnafield is the church.